HZ-15 concrete electric core drilling machine is a new construction machine for mechanical drilling of concrete. It is easy to operate, light and flexible, accurate drilling and sampling, smooth surface after drilling, and no accidents on the drilled material. Damaged, it is an ideal construction machinery drilling rig is powered by a series motor, with artificial diamond stone wall drill bit
HZ-15混凝土電動鉆孔取芯機技術參數(shù):
★大鉆孔取芯直徑 150mm
★大鉆孔取芯深度 400mm
★電子功率表 2.2kw
★電壓 220V
★外形尺寸 480×250×880mm
★重量:100kg
HZ-15 concrete electric drill corer technical parameters:
★ Large hole core diameter 150mm
★ Large hole core depth 400mm
★Electronic power meter 2.2kw
★ voltage 220V
★Dimensions 480×250×880mm
★ Weight: 100kg
HZ-15混凝土電動鉆孔取芯機使用前準備工作:
★為保證安全正常工作,使用前,先閱讀使用說明書,熟悉鉆機的結構和使用方法
★把鉆機各部分擦干凈,立柱的齒條部位加20號機械油(GB443-64)潤滑.
★在需鉆孔處先用電鉆打一個∮19×50孔一個,將鉆機移至工作處,調整支承螺釘,用水平儀觀察至水平,此時兩滾輪應離地,然后把膨脹螺栓按在∮19×50的孔處上緊。
★鉆機固定好后,將水嘴接上水源,擰開水源開關,檢查是否有水流出,如有則屬正常。
★按要求打孔的尺寸裝上鉆頭。
★接通電路,打開電器開關,空運轉幾分鐘,并轉動進給手柄,檢查是否靈活,動作可靠,如各部件動作靈活時方向進行操作。
Preparation for HZ-15 concrete electric drilling core coring machine:
★ In order to ensure safe and normal work, read the instruction manual before use, familiar with the structure and use of the drilling machine.
★ Wipe all parts of the rig clean, and the rack part of the column is lubricated with No. 20 mechanical oil (GB443-64).
★In the hole to be drilled, first use a drill to make a ∮19×50 hole. Move the rig to the working position, adjust the support screw, and observe the level with the level. At this time, the two rollers should be off the ground, then press the expansion bolts on the ∮ The 19×50 hole is tightened.
★ After the rig is fixed, connect the faucet to the water source, unscrew the water source switch, check if there is water flowing out, if any, it is normal.
★ Install the drill bit according to the size required for punching.
★ Turn on the circuit, turn on the electrical switch, run for a few minutes, and turn the feed handle to check whether it is flexible and reliable. If the parts are flexible, operate in the direction.
注意事項:
★孔時,應手感阻力不大,切削平穩(wěn),鉆時進給速度為4-5m/min左右當鉆孔接近完畢時,由于切削力的改變,鉆孔有些震動,此時要適當降低進給速度,當切削完畢時,應立即快速提升鉆頭直至刃口脫離工作,并關閉鉆機和切斷水源。
★整個鉆進過程必須保持充分水冷卻。從鉆進物體槽中觀察,即表示水供應不足,需停鉆進行檢查。但當鉆削將完畢時,水流入下層而不外溢,此屬正常。
★鉆孔中和鉆進結束快速提升鉆頭時,不得停車,而應待鉆頭剛剛脫離工作時,停止主軸旋轉,再將鉆頭提升。
★鉆進中,如發(fā)現(xiàn)鉆頭受卡,應迅速將鉆頭提升一段,然后再慢慢鉆入,切忌硬性鉆進而打壞鉆頭。
★如鉆進過程中,電機溫度超過70℃,應暫進停機,待冷卻后再使用。
★撥動開關鈕,正向轉動操作手柄,使鉆頭慢慢接觸凝土表面,待鉆頭刀部入槽后,方可加壓進鉆。
★如在進鉆過程中,出現(xiàn)鉆頭不能進鉆,鉆頭表面金剛石部分沒有全部露出,需用強磨耗材料(如耐火磚,砂輪等)開刃,使鉆頭表面層金剛石*露出,此時用手摸表面層,有毛糙感,方可進鉆。
HZ-15 concrete electric drilling core machine Note:
★When the hole is used, the resistance should be small, the cutting is stable, and the feed speed during drilling is about 4-5m/min. When the drilling is nearing completion, the drilling will be slightly vibrated due to the change of cutting force. Speed, when cutting is completed, the drill should be lifted quickly until the cutting edge is out of service, and the drill is turned off and the water source is shut off.
★ The entire drilling process must be kept fully water cooled. Observing from the drilling object slot means that the water supply is insufficient and it is necessary to stop the drill for inspection. However, when the drilling is completed, the water flows into the lower layer without overflowing, which is normal.
★ When drilling the drill bit and drilling the drill bit quickly, do not stop, but wait for the drill bit to just leave the work, stop the spindle rotation, and then raise the drill bit.
★When drilling, if the drill bit is found to be stuck, the drill should be lifted quickly for a while, then slowly drilled in. Avoid hard drilling and then break the drill bit.
★ If the motor temperature exceeds 70 °C during the drilling process, it should be temporarily stopped and used after cooling.
★Toggle the switch button, and rotate the operation handle in the forward direction to make the drill bit slowly contact the surface of the concrete. After the cutter blade is inserted into the groove, the drill can be pressurized.
★If during the drilling process, the drill bit cannot be drilled, the diamond part of the drill bit surface is not completely exposed. It is necessary to use a strong wear material (such as refractory brick, grinding wheel, etc.) to open the surface of the drill bit surface. Touch the surface layer and have a rough feel before you can drill.
維護和保養(yǎng):
★如鉆進過程中有些震動,鉆進結束后,必須仔細檢查連結部位,及時調整緊固。
★鉆機應保持清潔。當鉆進完畢,應將鉆機各部位擦干凈后,并加機油潤滑各運動部位,放在防塵干燥處,用塑料薄膜罩罩上。
★鉆頭裝入主軸前,應在兩件連結螺紋處加入鈣基潤滑脂,再擰緊,以便拆卸時方便。
★長期停止工作的鉆機,重新使用時,必須測試繞阻與機殼間的絕緣電阻,其數(shù)值應不少于5 M。
★鉆頭刃口磨損和崩裂嚴重應更換鉆頭,以免在鉆削過程中損壞電機而不能繼續(xù)作業(yè)。
★必須定期檢查電源線,插頭,開關,炭刷,換向器,以免使用時發(fā)生事故。
★必須定期檢查減速箱內潤滑油情況,并隨時加以補充,軸承處加鈣一鈉其潤滑脂(ZGN-1或ZGN-2),齒輪上加3號鈣基潤滑脂(ZG-3)。
HZ-15 concrete electric drilling core machine maintenance and maintenance:
★ If there is some vibration during the drilling process, after the drilling is finished, the joints must be carefully checked and the fastenings adjusted in time.
★ The rig should be kept clean. When the drilling is completed, the parts of the rig should be wiped clean, and the moving parts should be lubricated with oil to be placed in a dust-proof and dry place, covered with a plastic film cover.
★Before inserting the drill into the spindle, add calcium-based grease to the two joint threads and tighten them for easy disassembly.
★ When the rig is stopped for a long time, the insulation resistance between the winding and the casing must be tested. The value should be no less than 5 M.
★ If the drill bit is worn and cracked seriously, the drill should be replaced to avoid damage to the motor during drilling and it is not possible to continue working.
★The power cord, plug, switch, carbon brush and commutator must be checked regularly to avoid accidents during use.
★ The lubricating oil in the gearbox must be checked regularly and supplemented at any time. The bearing is filled with calcium-sodium grease (ZGN-1 or ZGN-2), and the gear is added with No. 3 calcium-based grease (ZG-3).
HZ-15混凝土電動鉆孔取芯機為立式鉆孔方向垂直向下,由電動機,變速箱,鉆頭,立柱,底座,升降機構等組成.
鉆機的結構,單相串激電動機裝在減速箱上,減速箱固定在升降機構上,使減速箱能帶動其主軸下面的鉆頭作上下移動,以達到鉆孔或取芯的目的.
立柱上有齒條,使變速箱沿立柱作上下移動,而其移動為通過手動旋轉進給手柄來達到的.
HZ-15 concrete electric core drilling machine is vertical downward direction, consisting of electric motor, gearbox, drill bit, column, base, lifting mechanism and so on.
The structure of the drilling rig, the single-phase series excitation motor is mounted on the reduction gear box, and the reduction gear box is fixed on the lifting mechanism, so that the reduction gear box can drive the drill bit under the main shaft to move up and down to achieve the purpose of drilling or coring.
The column has a rack that moves the gearbox up and down along the column, and its movement is achieved by manually rotating the feed handle.