一、ZBSX-92A頂擊式混凝土震篩機適用于公路、建筑、地質冶金科研等部門的試驗室對物料進行篩分分析,每次機5分鐘,既方便又簡單完成工作。
First, the impact concrete shaker is a screening instrument, which is suitable for the screening and analysis of materials in the laboratories of highways, construction, geological and metallurgical research departments, etc. It is convenient and simple to complete the separation when the machine is turned on for 5 minutes. *jobs.
二、ZBSX-92A頂擊式混凝土震篩機技術參數:
★篩子直徑:300mm-200mm
★篩子疊高:440mm
★篩座震幅:8mm
★篩搖動次數:221次/分
★震擊次數;147次/分
★回轉半徑:12.5毫米
★電機功率:0.37千瓦
★電機轉速:1400次/分
★外形尺寸:(長*寬*高) 600*400*800毫米
★總重量:120kg
Second, the technical parameters of impact concrete shaker:
★ Sieve diameter: 300mm-200mm
★ Sieve stack height: 440mm
★ Sieve base vibration amplitude: 8mm
★ Sieve shaking frequency: 221 times / minute
★ Shock times; 147 times / minute
★ Turning radius: 12.5 mm
★ Motor power: 0.37 kW
★ Motor speed: 1400 times / minute
★ Dimensions: (L * W * H) 600 * 400 * 800 mm
★ Total weight: 120kg
三、ZBSX-92A頂擊式混凝土震篩機操作規(guī)程:
開機前,擰出上螺栓,加足潤滑油,用20號普通機油5公斤為宜,裝篩時先將鈕緊螺栓左旋以松動開篩蓋故地功能頂桿。然后連同篩蓋往上提,然后右旋固定 可置套篩與篩托盤上,再將擰緊螺栓左右松開往下壓并右旋使之固定即可工作,根據工作需要,需要常開可將旋鈕轉至常開位,需要定時工作可將旋鈕轉至要求定時位,需要途中停機,應切斷電源開關,讓定時鐘自行轉至停止位置,不能強行扭回。本機保養(yǎng)簡單,每隔6個月更換機油一次,使用時注意避免蓋板上的7根導桿的變形。
Third, the operating rules of the impact concrete shaker:
Before turning on the machine, unscrew the upper bolts and add enough oil. It is advisable to use 5 kg of 20 # ordinary engine oil. When installing the sieve, first turn the button bolts to the left to loosen the function of the sieve cover. Then lift it up with the sieve cover, and then turn it right to fix it You can set the sieve and the sieve tray, and then loosen the tightening bolts left and right to press down and turn it right to fix it to work. The knob can be turned to the normally open position. If you need to work regularly, you can turn the knob to the required timing position. If you need to stop it on the way, you should turn off the power switch and let the fixed clock turn to the stop position by itself. The machine is easy to maintain. Change the oil every 6 months. When using it, pay attention to avoid deformation of the 7 guide bars on the cover.
四,頂擊式混凝土震篩機保養(yǎng):
1、將電機線插頭在程控器插座上,將電源線插頭插在三相線插座上。
2、按下電源開關,顯示屏亮,同時出現300秒。
3、設定時間:
a)根據用戶需要,按輕接觸鍵△為上調,按▽為下調,每按一次△▽為60秒。
b)根據試驗規(guī)程設定需要時間,按ON鍵機械開始工作,運作時指示燈亮。
c)本儀器在正常工作時,需要停機按OFF鍵盤。
d)每停機一次,應重新設定時間。
e)注意:使用時不要頻繁開、關機器,停機后應切斷電源
Fourth, the maintenance of top impact concrete shaker:
1. Connect the motor cable plug to the socket of the program controller and the power cable plug to the three-phase cable socket.
2. Press the power switch, the display lights up and appears for 300 seconds.
3. Set time:
a) According to the needs of the user, press the light touch key △ to increase, press ▽ to decrease, each press △ ▽ is 60 seconds.
b) Set the required time according to the test regulations. Press the ON button to start the machine. The indicator light will turn on during operation.
c) When the instrument is working normally, you need to stop and press the OFF keypad.
d) The time should be reset after each shutdown.
e) Caution: Do not turn on or off the machine frequently during use, and cut off the power after stopping
五,頂擊式混凝土震篩機工作原理:
本機主要由傳動、擺動、震擊、夾緊機構及電器等部分所組成。本機由電動機通過主軸,傳動軸帶動齒輪,由蝸輪再帶動凸輪,主偏心軸帶動兩個副偏心軸,從而使篩座具有回轉及震擊雙重運動。
Fifth, the working principle of the impact concrete shaker:
This machine is mainly composed of transmission, swing, shock, clamping mechanism and electrical appliances. This machine is driven by the motor through the main shaft and the transmission shaft to drive the gear, and the worm gear to drive the cam. The main eccentric shaft drives the two auxiliary eccentric shafts, so that the screen seat has the dual motions of rotation and shock.
六,頂擊式混凝土震篩機安裝與調試:
可以不用水泥基礎直接安放水泥地面上開動,也可以安裝在水泥基礎上,基礎螺釘尺寸如圖:其厚度300毫米。基礎露出地面高度及大小或與地面相平,根據具體使用需要而定,按電工規(guī)程安裝電路與接地,安裝完畢接通電源后電動機回轉方向與箭頭相同, 有震擊運動,若相反則電機空運轉,此時可換接線頭,方能正常開動。
Installation and commissioning of impact concrete shaker:
It can be placed directly on the concrete floor without the use of a cement foundation, or it can be installed on the cement foundation. The height and size of the foundation exposed on the ground or level with the ground, according to the specific needs of use, install the circuit and ground according to the electrical regulations, after the installation is completed, the direction of rotation of the motor is the same as the arrow, there is shock motion, if the opposite The motor is running dry. At this time, you can change the terminal to start normally.