一、產(chǎn)品簡介:
初期干燥抗裂性試驗儀是檢測儀器,用于建筑涂料、室內(nèi)外建筑膩子在規(guī)定風(fēng)速的條件下的初期干燥抗裂性試驗。該儀器根據(jù) 標(biāo)準(zhǔn)GB9779—88設(shè)計制造的QKL型主要適用于建筑涂料、室內(nèi)外建筑膩子在規(guī)定風(fēng)速的條件下的初期干燥抗裂性試驗。
Product introduction:
一,The initial dry crack resistance tester is a testing instrument for the initial dry crack resistance test of architectural coatings, indoor and outdoor building putty under the conditions of the specified wind speed. The QKL type designed and manufactured by this instrument according to the standard GB9779-88 is mainly applicable to the initial dry crack resistance test of architectural coatings, indoor and outdoor building putty under the conditions of specified wind speed.
二、技術(shù)參數(shù):
?儀器總功率:100w
?風(fēng)機風(fēng)速:3米/秒±03(可無級調(diào)速)
?風(fēng)速儀:0-10米/秒
?外形尺寸:1000X300X360mm
?儀器重量:27kg
Technical Parameters:
? Total instrument power: 100w
? Fan speed: 3m / s ± 03 (stepless speed regulation)
? Anemometer: 0-10 m / s
? Dimensions: 1000X300X360mm
? Instrument weight: 27kg
三、工作原理:
在風(fēng)洞中置有與空氣流方向平行的試板架,起動軸流風(fēng)機后,用風(fēng)量調(diào)控裝置將風(fēng)速調(diào)控在3±0.3m/s內(nèi),將涂刮好的試板置于檢風(fēng)洞中的試板架上,按產(chǎn)品標(biāo)準(zhǔn)要求調(diào)節(jié)干燥控制時間,待到時間后,自動停機,目測試板表面有無裂紋出現(xiàn)。
Third, the working principle:
A test plate frame parallel to the air flow direction is placed in the wind tunnel. After starting the axial flow fan, the wind speed is controlled within 3 ± 0.3m / s by the air volume control device, and the coated test plate is placed in the wind detection tunnel. On the test plate rack, the drying control time is adjusted according to the product standard requirements. When the time reaches, the machine will automatically stop and test for cracks on the surface of the board.
四、操作規(guī)程:
? 風(fēng)速計的操作:
(1) 將1號電池4節(jié)置入風(fēng)速儀底蓋內(nèi),測頭插頭插入儀器插孔內(nèi)。
(2) 儀表盤電源轉(zhuǎn)換開關(guān)置于“通”的位置,校正開關(guān)置于“滿度”位置,調(diào)節(jié)“滿度粗調(diào)”及“滿度細(xì)調(diào)”旋鈕,使電表指針在滿度刻度位置。
(3) 校正開關(guān)置于“零位”位置,調(diào)節(jié)“零位粗調(diào)”,及“零位細(xì)調(diào)”旋鈕,使電表指針在零點位置。
(4) 反復(fù)操作(2)、(3)項,直至調(diào)準(zhǔn)為止。
? 計時器的操作:
本計時器延時范圍0.01秒—99小時99分,任意預(yù)置,中間按鍵為時段開關(guān)。
h (小時) m (分) s (秒)
_h _m _s 代表為倒時
h m s 代表為正計時
+ 為增加鍵 — 為減少鍵
將計時器調(diào)整在所需要的時間內(nèi)。
注:此項工作在開機前預(yù)置,開機后不得擅自變動計時器的預(yù)置鍵,否則計時無效。
? 按涂料膩子產(chǎn)品說明中規(guī)定用量的主涂料,膩子涂布在已準(zhǔn)備好的試板表面(底涂料之上)后,立即置于風(fēng)洞內(nèi)試板架上,試板與氣流方向平行放置。此試驗機一般可以放置二個試件做平行試驗。
? 將試驗機電源打開,電源指示燈亮,軸流風(fēng)機起動,計時器開始計時。
?輕輕拉動測頭螺塞,露出熱球,測頭紅點對準(zhǔn)風(fēng)向,以垂直于風(fēng)向插入測試孔內(nèi),插入深淺一般為試板的中間位置,調(diào)節(jié)風(fēng)速控制旋鈕,觀察風(fēng)速計指針,使風(fēng)向調(diào)控在3±0.3m/s以內(nèi),風(fēng)干工作始。
?當(dāng)計時器到達(dá)預(yù)置時間后,試驗機停止工作,取出試板,目測表面有無裂紋。
Fourth, operating procedures:
? Operation of anemometer:
(1) Put 4 AA batteries into the anemometer bottom cover, and insert the probe plug into the instrument jack.
(2) The power switch of the instrument panel is set to the "ON" position, the calibration switch is set to the "full-scale" position, and the "full-scale coarse adjustment" and "full-scale fine-adjustment" knobs are adjusted so that the meter pointer is at the full-scale scale .
(3) Set the calibration switch to the "zero position", adjust the "zero coarse adjustment" and "zero fine adjustment" knobs so that the meter pointer is at the zero position.
(4) Repeat operations (2) and (3) until the alignment is completed.
? Timer operation:
The delay range of this timer is 0.01 seconds-99 hours and 99 minutes, which can be preset arbitrarily, and the middle button is the time period switch.
h (hours) m (minutes) s (seconds)
_h _m __ s stands for time
H, m, s, s, s
+ Is the increase key — is the decrease key
Adjust the timer to the required time.
Note: This work is preset before booting. Do not change the timer's preset key after booting, otherwise the timing will be invalid.
? According to the main amount of paint specified in the paint putty product description, putty is applied on the surface of the prepared test plate (on top of the primer) and immediately placed on the test plate rack in the wind tunnel. . This testing machine can generally place two test pieces for parallel testing.
? Turn on the power of the testing machine, the power indicator light is on, the axial fan starts, and the timer starts counting.
? Gently pull the plug of the probe to expose the hot ball. The red dot of the probe is aligned with the wind direction and inserted into the test hole perpendicular to the wind direction. The depth of insertion is generally the middle position of the test plate. The wind direction shall be adjusted within 3 ± 0.3m / s, and the air-drying work shall begin.
? When the timer reaches the preset time, the test machine stops working, remove the test plate, and visually inspect the surface for cracks.
五、儀器結(jié)構(gòu):
試驗機主要由軸流風(fēng)機,試驗風(fēng)洞,試片架和風(fēng)量調(diào)控裝置,計時器,風(fēng)速計等組成。
注意:整機保險置于電源擦座內(nèi)
Five, instrument structure:
The testing machine is mainly composed of an axial flow fan, a test wind tunnel, a test piece holder and an air volume control device, a timer, and an anemometer.
Note: The whole machine insurance is placed in the power supply wiper seat